TMS International Tech(HK) Limited Hello! now TMS International Tech(HK) Limitedtms@lcdchip.com
Follow us :

TFT-LCD Panel(36644)

  • Part No.
  • Description
  • Price
  • Quantity
  • Operation
0.96-inch, 128*64, 150 brightness, 14 pins, SPI interface, ST7735S, TFT LCD display module
-

In Stock :0

Minimum:1

IPS 0.96 inch 80x160 Micro TFT LCD Display Module For Smart Home
-

In Stock :0

Minimum:1

2.4 inch TFT LCD 240*320, SPI, 500nits, with CTP
-

In Stock :0

Minimum:1

RisingStar 42" Passenger Information Display High Brightness Stretch Bar LCD Hi Tni LCM
-

In Stock :0

Minimum:1

4.3-inch, 480*272, Brightness 1300, 40 pins, TTL Interface, ST7282G4, High Brightness LCD Display
-

In Stock :0

Minimum:1

12.3inch, 1920x720, 1000nits, 40pins, LVDS I/F, IPS industrial high brightness 与AUO模组C123HAN01.0 PIN TO PIN
-

In Stock :0

Minimum:1

14-inch 1920*1080 IPS 1000 brightness 30PINS EDP ZX Display High Bright LCD
-

In Stock :0

Minimum:1

2.8-inch, IPS , 240*320, 350 nits, 50 Pins, mcu/rgb/spi interface
-

In Stock :0

Minimum:1

10.1inch lanscape screen, wide temperature -30~+80 , 1000nits, high brightness, sunlight readable, USB touch panel, I2C touch screen, HDMI board, 10.1 inch LCD display, 10.1'' display, 1280x800, 40pin, LVDS interface, Free/All/Wide viewing ang
-

In Stock :0

Minimum:1

7inch 800x480 450nits 40pins TTL
-

In Stock :0

Minimum:1

3.49-inch 172X640 bar-shaped LCD display, fully laminated touch screen, full interface, ready stock LCD screen manufacturer
-

In Stock :0

Minimum:1

2.1-inch circular 480*480, 40 pins, ST7701S, 220 brightness, full-view smart home LCD display screen
-

In Stock :0

Minimum:1

11.6 inch IPS Display, TFT LCD, EDP Interface, 1920x1080 Pixels, TBD, for Industrial Display, Advertising Machine
-

In Stock :0

Minimum:1

Rogin 2.4inch, 240*320, 250nit, SPI/RGB interface, TFT-LCM-CTP
-

In Stock :0

Minimum:1

7inch TFT display, 1024*600, IPS LCD, 420cd/m², 50PINS, TTL, Industrial screen, Commercial LCD screen, HX8282-A11+HX8696-A01
-

In Stock :0

Minimum:1

32 inch QLED 350cd
-

In Stock :0

Minimum:1

12.1-inch, 1280 * 800, 550nits, LVDS, full view, 30bins, -20~+70 ℃ LCD screen compatible to replace G121ICE-L01
-

In Stock :0

Minimum:1

2.8 inch 240x320 TFT LCD RTP Touch Screen Display Module With ILI9341 and PCB Controller Board
-

In Stock :0

Minimum:1

3.5" IPS TFT LCD 320x240 SPI/RGB Dual-IF - Industrial Touch Module for HMIs & Medical Devices
-

In Stock :0

Minimum:1

4.7 inch TFT LCD, MIPI, IPS, High Resolution, Capacitive Touchscreen
-

In Stock :0

Minimum:1

Total 36644 Record«Prev1... 471472473474475476477478...1833Next»
TMS International Tech(HK) Limited TMS International Tech(HK) Limited TMS International Tech(HK) Limited
TMS International Tech(HK) Limited
TMS International Tech(HK) Limited TMS International Tech(HK) Limited TMS International Tech(HK) Limited TMS International Tech(HK) Limited
Search

Search

PRODUCT

PRODUCT

PHONE

PHONE

USER

USER